Every crew.
Every crane.
One timeline.

The scheduling engine built for general contractors running fifteen active sites — turns whiteboard chaos into a live dispatch system that confirms in minutes, not days.

1,247

↑ 18% from last week

98.6%

Industry avg: 71.2%

34

Across 6 metro areas

11min

Was: 3.2 days avg

CONFIDENTIAL FINDINGS

The scheduling problem is bigger than you think.

Data from 847 general contractors across North America, collected Q3–Q4 2025. These numbers are uncomfortable.

FINDING 01
14.3h

Average weekly hours lost to manual scheduling per project manager

The average GC loses a full work day every week — just on scheduling.

Phone tags, WhatsApp threads, whiteboard updates, re-confirmations after weather changes. None of it moves a single cubic yard of concrete.

FINDING 02
3.2d

Average booking-to-confirmation time without automated scheduling

Sub crews wait an average of 3.2 days for booking confirmation.

Specialty crews can't commit to your timeline if they don't know they're on it. Late confirmations cascade into idle crews, missed windows, and premium overtime rates.

LIVE REPLAY

One double-booking. Five cascading delays.

How a single scheduling conflict at 6 AM Monday compounds into $38K by Friday.

Mon 6:00 AM
Excavation crew double-booked
Mon 10:30 AM
Foundation pour delayed 1 day
Tue 7:00 AM
Steel erection crew idles
Tue 2:00 PM
Concrete pump rental extended
Wed–Thu
Electrical rough-in pushed
End of Week
Total overrun: $38,400
FINDING 03
2.1h

Average daily time lost to morning dispatch coordination

Operations managers spend their first two hours every morning on logistics, not management.

Cross-referencing crew availability against site schedules against equipment delivery windows — manually. Every. Single. Morning. That's 10+ hours per week that should be automated.

Dispatch solves all three findings. Simultaneously.

One scheduling engine. Every crew, crane, and pour visible in a single live timeline.

Run Your First Schedule Free

Three capabilities that eliminate
the three findings.

Built for operations that run in the field, not in a boardroom.

CAPABILITY 01

Drag-to-assign timeline. Changes propagate in seconds.

Pull a crew from one site to another. Every downstream dependency — equipment, sub confirmations, material deliveries — recalculates automatically. No phone calls. No spreadsheet updates. No missed notifications to the site foreman.

Week of Feb 24, 2026

LIVE
Mon
Tue
Wed
Thu
Fri
Sat
Excavation — Martinez Crew
Site A
Foundation — Chen & Sons
Site A
Steel — Okonkwo Erection
Site B
Concrete — Rivera Pumping
Site C
Electrical — Park Electric
Site B
Drag to reassign — changes propagate instantly
CAPABILITY 02

Automated sub notifications. Confirmation in 11 minutes, not 3 days.

The moment a schedule slot opens or changes, every affected sub crew receives a simultaneous SMS and in-app notification with the updated details. One tap to confirm. Dispatch tracks response time and escalates if a crew goes silent.

3 pending
✓

Martinez Excavation confirmed

Site A, Mon Feb 24 · 6:00 AM

11m ago
⚡

Chen & Sons — schedule updated

Pushed to Tue 7:00 AM (weather)

2m ago
✓

Okonkwo Steel confirmed

Site B, Wed Feb 26 · 7:30 AM

Just now

Sub crews receive SMS + app notification simultaneously. No more phone tag.

CAPABILITY 03

Weather-delay rescheduling. Runs before your morning coffee.

Dispatch monitors 72-hour forecasts against every scheduled activity — concrete pours, crane operations, exterior framing. When a conflict appears, it proposes a reschedule and notifies affected crews before 5 AM, so your morning briefing starts with solutions, not problems.

Alert detected: Thu Feb 27 — Heavy rain, 0.8" forecast

⚡ Auto-resolving

Rivera Concrete Pour

Auto-rescheduled
Site CThu 6:00 AM→ Fri 6:00 AM

Park Electrical Rough-in

No impact
Site BThu 9:00 AM — clear

Dispatch cross-references 72hr weather forecasts against concrete cure windows, crane operation limits, and crew schedules automatically.

Numbers from contractors who
stopped guessing.

−$214K

Scheduling-related overruns eliminated in first 90 days

“We were hemorrhaging money on idle crews and overtime we didn't budget for. Dispatch showed us exactly where the bleeding was — and stopped it in the first week.”

Hargrove Construction Group

VP Operations · Dallas–Fort Worth, TX

11 min

Average booking-to-confirmation time, down from 3.2 days

“My sub crews used to ghost me because they'd already committed elsewhere by the time I confirmed. Now they confirm before they leave the previous job.”

Meridian Structural

General Superintendent · Chicago, IL

18 sites

Managed simultaneously by one ops manager, previously required three

“I used to spend my first two hours every morning just figuring out who goes where. Now I open Dispatch and everything's already sorted — including the weather rescheduling.”

Pacific Ridge Contractors

Operations Manager · Seattle, WA

Trusted by general contractors across North America

Hargrove GroupMeridian StructuralPacific RidgeCoastal Build Co.Steelmark GCIronwood ConstructionSummit ContractorsApex Build

Run Your First Schedule Free

Enter your email and site count. We drop you directly into a pre-loaded demo timeline you can manipulate in real time — no credit card, no sales call.

No credit card. No sales call. Cancel anytime.

14.3h

Lost per week per PM to manual scheduling

$38K

Average overrun per project from double-bookings

98.6%

On-time arrival rate with Dispatch vs 71.2% industry average

11 min

Booking-to-confirmation, down from 3.2 days

See the Full Industry Report

847 GCs. 14 months of data. The complete findings — including the regional breakdown and crew-type analysis — sent directly to your inbox.